 | R.W. Setterlin Building Company is currently preparing bids for the following projects
Architect's response to RFIs #2 and 3 are posted for review.
Architect's response to RFI #1 is posted for review.
Project consist of renovation of facade of the dealership showroom.
Addendum 1 has been posted. 400 day duration renovating 8 floors of state offices. Normal working hours, areas will be vacated. Prevailing wage, tax exempt. Hazardous abatement, selective interior demolition, concrete rehabilitation, small masonry, exterior masonry restoration, small steel, fireproofing, water repellents, caulking, doors, storefront, coiling grilles, , MS/DW/ACT/plaster, terrazzo, flooring, access flooring, marble flooring, wall covering and painting, Div 10, Demountable partitions, operable partitions, Hat racks, food service, window shades, and casework.
Bid Clarification No. 2 is posted.
Bid Clarification No. 1 is posted.
Project is a new store location with multiple bid packages. RW Setterlin is bidding the TAR-6.0 – General Trades Package. This package consists of General Conditions as it applies to our scopes, Rough Carpentry, Architectural Woodwork, Exterior Insulation and Finish System, Joint Sealants, Hollow Metal Doors and Frames, Fire Rate Overhead Coiling Shutters, Insulated Overhead Coiling Doors, Traffic Doors, Sectional Doors, Door Hardware, Wall Coverings, Miscellaneous Specialties, Metal Toilet Compartments, Fire Protection Specialties, Accordion Folding Partitions, Toilet Accessories, Loading Dock Equipment, Roller Window Shades, Cart Area Grid System, and Site Furnishings.
|  |