|
Home :: Projects Bidding :: Projects Awarded
ADDENDUM #2 POSTED (HVAC ONLY)
ADDENDUM #1 POSTED This is a small private renovation of two existing restrooms in the Capital University Conservatory of Music. Addendum 1 posted.
Project Information Site demo, earthwork, utilities, parking, seeding, concrete, masonry, steel, shingles, damproofing, caulking, doors, frames, detention doors and frames, overhead doors, glazing, louvers, MS/DW/ACT, flooring, resinous flooring, painting, Div 10, detention furnishings. Setterlin is preparing a combination bid that would include fire suppression, plumbing, HVAC, electric, and electronic safety and security. This is a single prime bid for a new park pavilion within the MVCH Community Park in Circleville, OH.
This is a renovation of an existing anatomy lab in Grosvenor Hall. Scope of work includes but is not limited to Selective Demolition, Metal Stairs, Doors, Frames, and Hardware, Access Doors, MS/DW, ACT, Terrazzo, Painting, Toilet and Bath Accessories, Plumbing, HVAC, and Electrical.
Addendum 1 posted.
window and curtainwall replacement, selected aluminum door replacement, some new stone sills, and tuckpointing at the top of the building. ADDENDUM #5 POSTED
ADDENDUM #4 POSTED ADDENDUM #3 POSTED ADDENDUM #2 POSTED ADDENDUM #1 POSTED This is a single prime bid for a new park in Dublin. It is prevailing wage and tax exempt. Addendum #1 is posted.
Hazardous Abatement and Demolition of an existing 4 story building on the OSU campus. Scope of work includes but is not limited to, Demolition of the some site and the entire interior of the building, hazardous abatement, and cutting, patching, and demolition of Mechanical, Plumbing, and Electrical items. Private, non-prevailing wage and tax exempt project.
Addendum 1 posted.
Replacement of doors and hardware, also includes painting of door frames. ADDENDUM #1 POSTED
General Trades bid for alteration and renovation of existing facility - prevailing wage, tax exempt and EDGE participation goal. ADDENDUM #1 POSTED
This is a renovation to the shower rooms in the existing residence hall. Addendum # 2 is posted.
Addendum # 1 is posted. This is an exterior renovation of the existing stadium with new press box, demolition and expansion of the existing track, field fencing, masonry ticket booth and storage buildings. Addendum #5 is posted for review. Bid date has been extended to December 5.
Addendum #4 is posted for review. Addednum #3 is posted for review. Bid date has extended to November 25. Addendum #2 is posted for review. Addendum #1 is posted for review. There will be a walk thru on November 4 from 9 am to Noon. Project consists of renovation of existing 275,000sf building and 1,900 sf of additions to the building. Addendum #2 is posted for review.
Project consists of renovation to the Community Gardens Building and construct new Education Pavilion and Summer Kitchen Building. Project is subject to prevailing wages and tax exempt. New 2 story 75,000 sf facility. Sitework, fencing, brick pavers, asphalt, seeding, PCI precast plank, masonry, AISC steel, casework, doors, waterproofing, caulking, metal roofing and siding, spray fireproofing, aluminum and glazing, detention doors, louvers, MS/DW/ACT, resilient and resinous flooring, paint, Div 10, radiation protection, elevator. Prevailing wages, tax exempt. Daily security clearance required.
Addenda 1,2,3,4 posted Addendum #4 has been posted.
Addendum #3 has been posted. Addendum #2 has been posted. Addendum #1 is included in the specifications. This project consists of the construction of a 4 story 98000sf building with partial lower level & mechanical penthouse. This project is tax exempt, subject to prevailing wage rates, and has an EDGE goal of 5%. Estimator for divisions 2-5 Mike Finck Estimator for divisions 6-14 Vince Dabo Addendum #4 has been posted.
Addendum #3 has been posted. Addendum #2 has been posted. Addendum #1 has been posted. Partial Demolition, renovation, and addition to existing school complex. This is a (4) phase project consisting of extensive renovations to the High School & Elementary School, and a 42,000 sf addition for the new Middle School.
Bid date extended to June 13, addendum 1 posted. Addendum 2 posted. Addendum 3 posted.Addendum 4 posted, changed bid date again. Addendum 5 and 6 posted. Project has bid, we are apparent low bidder.
|