 |
New 2 story 75,000 sf facility. Sitework, fencing, brick pavers, asphalt, seeding, PCI precast plank, masonry, AISC steel, casework, doors, waterproofing, caulking, metal roofing and siding, spray fireproofing, aluminum and glazing, detention doors, louvers, MS/DW/ACT, resilient and resinous flooring, paint, Div 10, radiation protection, elevator. Prevailing wages, tax exempt. Daily security clearance required.
Addenda 1,2,3,4 posted
Addendum #2 and #3 are posted for review.
renovation of bathrooms on four floors, 2 month duration. Hazardous abatement, demolition, casework, MS/DW/ACT/AWP, doors, paint, ceramic tile, Div 10. Addendum 1 Added
8,100 SF expansion and renovation to the existing Justice Center in the city of Delaware. This project is prevailing wage and tax exempt. Addendum #1 Posted.
3 Addenda have been issued.
Due to the complexity of the bid we are requesting that subcontractor and supplier bids are submitted by 4:00 Monday February 25th.
Addendum #4 has been posted.
Addendum #3 has been posted.
Addendum #2 has been posted.
Addendum #1 is included in the specifications.
This project consists of the construction of a 4 story 98000sf building with partial lower level & mechanical penthouse. This project is tax exempt, subject to prevailing wage rates, and has an EDGE goal of 5%.
Estimator for divisions 2-5 Mike Finck
Estimator for divisions 6-14 Vince Dabo
Playgrounds for 4 new elementary schools in Newark. Site prep, paving, game lines, recreational equipment, fencing, seeding.
Addendum #4 has been posted.
Addendum #3 has been posted.
Addendum #2 has been posted.
Addendum #1 has been posted.
Partial Demolition, renovation, and addition to existing school complex.
This is a (4) phase project consisting of extensive renovations to the High School & Elementary School, and a 42,000 sf addition for the new Middle School.
Bid date extended to June 13, addendum 1 posted. Addendum 2 posted. Addendum 3 posted.Addendum 4 posted, changed bid date again. Addendum 5 and 6 posted.
Project has bid, we are apparent low bidder.
Addendum #5 has been posted for review.
Addendum #4 has been posted for review. This bid date has been changed to June 19, 2007.
Addendum #3 has been posted for review.
Addendum #2 has been posted for review. The bid date has been changed to June 12, 2007.
Addendum #1 has been posted for review.
This project consists new construction for a new 2 story elementary school approximately 90,000 SF.
This project consists of a new construction of a 11,000 SF three story building
Project has bid. 180,000 sf renovation. Site utilities, site demo, asphalt, concrete, masonry, Steel, casework, roofing, caulking, doors, windows, louvers, terrazo restoration, flooring, plaster, MS/DW/ACT, paint, Div 10, food service, residential appliances, fume hoods, paint spray booth, greenhouse. Addendum 1 posted. Addendum 2 posted.
Addendum 3 posted. Addendum 4 posted.
|  |