Home :: Projects Bidding :: Projects Awarded
Addendum 3 has been posted.
Addendum 2 has been posted. Addendum 1 has been posted. Interior demolition and renovation of existing science labs located within six different high schools. Work to include demolition, asbestos abatement, lab casework, doors/frames/HW, MS/DW/ACT, painting, flooring, and furnishings. ADDENDUM 1 has been posted
ADDENDUM 2 has been posted ADDENDUM 3 has been posted ADDENDUM 4 has been posted (BID DATE CHANGED to 10-28-11 at 2:00 pm) The building is a 92,904 SF, 3 story, 100 units Senior Living Facility with common space, retail space, offices and a small clinic. Addendum 1 posted.
sidewalk replacement along 17th Ave. Demolition, concrete, sod, grass pavers, asphalt. Addendum 2 has been posted.
Addendum 1 has been posted. This project is a re-bid. The drawings and specifications have been re-issued. Be sure to base your bid on the revised drawings. - Construction of a new 14,000 sf nature center. - This project requires prevailing wages. Addendum 2 has been posted.
Addendum 1 has been posted. Construction of a Compressed Natural Gas fueling station. This project consists of construction of a new Compressed Natural Gas fueling station and renovations to the existing maintenance / service complex. Certain Equipment for compressing and dispensing the fuel to be provided by others; but installed by the successful bidder, as set forth in the Contract Documents. Demolition; Cast-in-place concrete; structural steel, metal gratings; firestopping; painting; compressed natural gas; hvac; electrical; earthwork. Add #1 Has Been posted
25 % DBE Goal Needed Installing 25 new vehicle lifts includes demo of existing concrete. addendum 4 posted
addendum 3 posted addendum 2 posted, 3 structural sheets now available, posted 06-10-2011. addendum 1 posted New 2 story 83,400sf structure. Sitework, asphalt, pier and lagging retaining wall, segmented retaining wall, unit pavers, playground equipment and surfacing, fencing, landscaping, concrete, masonry, steel, waterproofing, membrane air barrier, insulated wall panels, TPO roofing, Fall Protection, spray fireproofing, caulk, expansion control, doors, OH doors, aluminum storefront, curtain wall and windows, skylights, polycarbonate wall assembly, MS/DW/ACT/AWP, flooring, wood flooring, resinous flooring, paint, Div 10, food service, stage curtains, scoreboards, gym equipment, casework, entrance floor grilles, telescoping stands, and elevators. ADDENDUM #1 HAS BEEN POSTED
The work includes construction of a pre-engineered structure for vehicle storage and maintenance as well as for administrative office space including private offices, waiting space, toilet rooms, conference/training rooms, driver lounge/ break area. conformed drawings and specifications (addenda have been incorporated) are now posted.
Setterlin has been awarded this project.
|